EPG is a specialist company and exporter that is concerned with the layout, improvement and manufacturing. EPG has been productively qualified by ISO9002 Good quality Administration Method, ISO9001 Quality Administration Method, API certification, ISO/TS16949:2002 and ISO10012 measurement administration system. EPG will constantly adhere to it enterprise spirit of becoming sensible, progressive, productive and excellent to make the leading international transmission travel. 600m Deep EPTT DTH Difficult Rocks Drinking water Effectively Drilling Rig
Application
JKCS400 Multi-purposeful EPTT mounted h2o nicely drilling rig is a successful,multi-function total EPTT drinking water effectively drilling rig.It is high effectiveness due to the fact of getting a more substantial torque of the turntable and is largely utilised for h2o effectively in industry and EPTT, national defense building foundation, geological exploration, geothermic well and other basis working, it is well-liked at home and abroad.
JKCS400 EPTT mounted drilling rig can drilling in all types formations by mEPTTdrilling in comfortable development and air DTH hammer in rock drilling,DTH Hammer is applied in rock drilling, slag is discharged by air strain and the offstage effectiveness is ten moments than traditional rotary drilling.
JKCS400 deep drinking water effectively drilling rigs, in cutting drilling or rotary drilling can be operated in unconsolidated layer, and the slag can be discharged unEPTTby mud, the influence drilling procedure can also be adopted and slag can be discharged by strain air, the EPTT drinking water well drilling rig suitable for drilling complex geological circumstances.
Attributes
one. The drilling rig can use air DTH Hammer drilling and mEPTTdrilling.
two. Centralized management console is suited for each and every manipulation and control. Fast pulling and lifting reduce the auXiHu (West Lake) Dis.liary time and improve the perform performance.
3. The EPTT chassis adopts the 6X4 EPTT crane chassis of manufacturer EPTTEPTT EPTT and the principal EPTT system, the transfer circumstance, EPTT, double-winch device, mEPTTpump, turntable,drilling tower, feed technique are set up on the chassis.
4. It really is a EPTTrotary drilling rig with directional circulation. It is outfitted with BW450/2A or BW850/two mEPTTpump which adopts the slurry as the washing fluid and can drill on clay, sand and rock if it is equipped with suited drilling little bit.
5. The EPTT of drilling rig arrives from a EPTT engine,132kw EPTT engine EPTTs the massive displacement high strain plunger pump and it is characterized by EPTTful dynamic and steady functionality.
six. The rotary head,have two EPTT,rotation velocity is -80 and160rpm stepless adjustment and the rotary torque is 4800-9600Nm.
7. The pulling force can be controlled and managed, which adapt the EPTT to deep gap drilling.
eight. It can established up a generator which is convenient to welding or illuminate for operate at night.
nine. Major winch are accessible on the rig so it is high efficiency when the rig drill on mEPTTrock and on the weathering formation.
10. The major EPTT of rig is hydrulic and the 4 lXiHu (West Lake) Dis.Hu (West Lake) Dis. legs and drilling tower are EPTT controlled. Transfer situation and mEPTTpump clutch method are also EPTT operated.
11. The instruments winch winch is utilized for auXiHu (West Lake) Dis.liary lifting and casing,optional primary winch drive of 4T, rope length of 100m and 8m lifting height.
twelve. The EPTT auXiHu (West Lake) Dis.liary features are straightforward and efficient for XiHu (West Lake) Dis.Hu (West Lake) Dis. extension, growth swing, boom elevate, XiHu (West Lake) Dis.Hu (West Lake) Dis. dumping.
thirteen. Competitive in price tag, reduced EPTT of maintain.
Specification
one | Geology drilled | All kinds | |
two | Drilling Sort | DTH amp MEPTTRotary | |
three | Drill technique and operation | EPTT | |
4 | Hole Diameter | mm | Phi140- Phi350 |
five | Gap Depth | m | 400 |
6 | Rotation Torque | Nm | 9600 1st Gear |
4800 2nd Ger | |||
seven | Rotation Pace | rpm | -80 1st Equipment |
-one hundred sixty 2nd Ger | |||
8 | Drill pipe diameter | mm | 89/114 |
9 | Drill pipe size | mm | 4000/4500 |
10 | AXiHu (West Lake) Dis.al strain | T | 85KN |
Winch | |||
11 | Max. EPTT power | T | 20 |
twelve | EPTT drive of Major winch(Optional) | T | 4 |
13 | EPTT drive of hoist | T | one.5 |
14 | Duration of metal wire rope(tool winch) | m | 100 |
15 | EPTT heigEPTT of device winch | m | eight |
Motor | |||
16 | EPTT Engine type | CUMMINS | |
seventeen | Rated Horse EPTT | Kw | 132 |
18 | EPT Program | 24 | Volt |
Compressor needed | |||
19 | Compressor Type | Rotary Screw/Movable | |
20 | Pressure Required | Mpa | one.05-four.5 |
21 | Air consumption | m sup3/min | 16-sixty |
EPTT | |||
22 | Company | EPTTEPTT EPTT | |
23 | Model | ZZ1257M5847C | |
24 | Engine | WD615.93C | |
25 | Rated Horse EPTT | kw | 270 |
26 | Discharge StXiHu (West Lake) Dis.Hu (West Lake) Dis.rd | EU-3 | |
27 | Push kind | 6*four | |
28 | Max.Velocity | Km/h | 102.nine |
29 | Steering wheel | remaining/correct(Optional) | |
MEPTTEPTT | |||
thirty | Sort | Hydrulic | |
31 | Design | BW450/BW850 | |
32 | Stroke | mm | a hundred and ten |
33 | Displacement | L/Min | 450 |
34 | Discharge force (Mpa) | Mpa | two-three |
35 | Suction tube diameter | mm | 89 |
36 | Discharge pipe diameter | mm | fifty one |
37 | Liner Diameter | mm | eighty |
EPTT Welder | |||
38 | Mnufacturer | Dynaset | |
39 | Welding existing | A | sixty-250 |
forty | EPTT Min.oilflow | L/min | 42 |
forty one | Nom/Max Force | Bar | a hundred ninety/210 |
forty two | Voltage | V | a hundred and ten/220VDC |
43 | EPTT | Kw | 1or2 |
forty four | L*W*H | mm | 390*a hundred ninety*230 |
forty five | Foam pump | Optional | |
Dimension | |||
forty six | Net Excess weight | T | 22 |
47 | EPTT Size | mm | 10500 |
48 | EPTT Width | mm | 2480 |
forty nine | EPTT Peak | mm | 3050 |
50 | Doing work measurement(L*W*H) | mm | 11000*2480*7147 |
EPTT amp Shipping and delivery
Service
In our after revenue service method, We create ideal control program strictly in accordance to ISO-9000 series, in this method, EPTT date and dilemma remedy answer and preventive steps will be offered in any preserve project, all the spare components will be utilized in new OEM goods with installation recommendations, EPTT listing, manufacturer’s instruction, qualification and Warranty certification.
We offer quotone tools amp one particular circumstance, countless provider, specifically the following income services start from the orEPTTconfirmation, last for the functioning life of the equipment.