“We are usually serving our consumers with our best items.” Hangzhou EPG Co.,Ltd. , was launched in November, 1997. With its 5 wholly owned subsidiaries. Our organization pays particular attention to customers’ needs, listening to the particular needs of each and every customer and guaranteeing whole fulfillment.
CSD300 EPTT Producer Drinking water Well Drilling Rig On EPTT
Software
CSD300 Multi-practical EPTT mounted h2o effectively drilling rig is a efficient,multi-function entire EPTT drinking water effectively
drilling rig.It is higher efficiency due to the fact of having a bigger torque of the turntable and is mainly used for drinking water properly in
market and EPTT, countrywide defense creating basis, geological exploration, geothermic nicely and other
basis working, it is common at home and overseas.
CSD300 EPTT mounted drilling rig can drilling in all kinds formations by mEPTTdrilling in delicate development and air DTH
hammer in rock drilling,DTH Hammer is used in rock drilling, slag is discharged by air force and the offstage
effectiveness is ten occasions than conventional rotary drilling.
CSD300 deep drinking water properly drilling rigs, in reducing drilling or rotary drilling can be operated in unconsolidated layer, and
the slag can be discharged unEPTTby mud, the effect drilling procedure can also be adopted and slag can be discharged
by force air, the EPTT water nicely drilling rig suitable for drilling complicated geological circumstances.
Attributes
1.The drilling rig can use air DTH Hammer drilling and mEPTTdrilling.
two.Centralized manage console is ideal for each manipulation and management. Quick pulling and lifting decrease the
auXiHu (West Lake) Dis.liary time and increase the function efficiency.
3.The EPTT chassis adopts the 4X2 EPTT crane chassis of model EPTTEPTT EPTT and the primary EPTT system, the
transfer situation, EPTT, double-winch unit, mEPTTpump, turntable,drilling tower, feed method are established up on the chassis.
four.It is a EPTTrotary drilling rig with directional circulation. It is equipped with BW250/BW450(Optional) mud
pump which adopts the slurry as the washing fluid and can drill on clay, sand and rock if it is outfitted with suited
drilling little bit.
5.The EPTT of drilling rig arrives from a EPTchai engine,93kw EPTchai engine EPTTs the big displacement large
stress plunger pump and it is characterized by EPTTful dynamic and stable overall performance.
six.The rotary head,rotation velocity is -100rpm stepless adjustment and the rotary torque is 3200-4500Nm.
seven.The pulling force can be controlled and managed, which adapt the EPTT to deep gap drilling.
eight.It can established up a generator which is convenient to welding or illuminate for function at night.
nine.Principal winch are obtainable on the rig so it is large performance when the rig drill on mEPTTrock and on the weathering
development.
10.The principal EPTT of rig is hydrulic and the 4 lXiHu (West Lake) Dis.Hu (West Lake) Dis. legs and drilling tower are EPTT controlled. Transfer scenario
and mEPTTpump clutch method are also EPTT operated.
11.The instruments winch winch is employed for auXiHu (West Lake) Dis.liary lifting and casing,optional main winch force of 1.5T, rope size of
100m.
12.The EPTT auXiHu (West Lake) Dis.liary functions are simple and effective for XiHu (West Lake) Dis.Hu (West Lake) Dis. extension, boom swing, growth lift, XiHu (West Lake) Dis.Hu (West Lake) Dis.
dumping.
Specification
1 | Geology drilled | All kinds | |
two | Drilling kind | DTH amp MEPTTrotary | |
3 | Drill method and procedure | EPTT | |
4 | Gap Diameter | mm | Phi90- Phi325 |
five | Gap Depth | m | 300 |
6 | Rotation Torque | Nm | 4500-8500 |
seven | Rotation Pace | rpm | -one hundred |
eight | Drill pipe diameter | mm | 76,89,102,114 |
nine | Drill pipe duration | mm | 3000/4500/6000 |
10 | Max. EPTT pressure | N | 8000 |
eleven | Max. Feed Velocity | m/min | eighteen |
12 | Feed Stroke | mm | 3400 |
Winch | |||
thirteen | EPTT power of hoist | T | .8 |
14 | Size of metal wire rope(instrument winch) | M | 100 |
Motor | |||
fifteen | EPTT Engine variety | YUCHAI | |
16 | Rated Horse EPTT | Kw | ninety three |
seventeen | EPT Technique | V | 24 |
Compressor Required | |||
eighteen | Compressor Type | Rotary Screw/Movable | |
19 | Pressure Essential | Mpa | one.2-3. |
twenty | Air consumption | m sup3/min | eleven-35 |
EPTT | |||
21 | Company | EPTTEPTT/XiHu (West Lake) Dis.HU (WEST LAKE) DIS.FENG | |
22 | Design | E13N2B00098 | |
23 | Engine | YC4E140-forty two | |
24 | Rated Horse EPTT | HP | one hundred forty |
twenty five | Discharge StXiHu (West Lake) Dis.Hu (West Lake) Dis.rd | EU-two | |
26 | Push kind | four*2 | |
27 | Max.Speed | Km/h | 102.nine |
28 | Steering wheel | remaining/correct(Optional) | |
MEPTTEPTT(Optional) | |||
29 | Type | EPTT | |
thirty | Design | BW450 | |
31 | Stroke | mm | 110 |
32 | Displacement | L/Min | 450 |
33 | Discharge pressure (Mpa) | Mpa | two-five |
34 | Suction tube diameter | mm | 89 |
35 | Discharge pipe diameter | mm | fifty one |
36 | Liner Diameter | mm | 80 |
Dimension | |||
37 | Web Fat | T | 15 |
38 | EPTT Duration | mm | 10600 |
39 | EPTT Width | mm | 2400 |
forty | EPTT Height | mm | 3050 |
41 | Operating measurement(L*W*H) | mm | 11000*2480*2850 |
EPTT amp Shipping and delivery
Services
In our right after income provider program, We build excellent control method strictly in accordance to ISO-9000 series, in this method, EPTT day and issue fix resolution and preventive steps will be presented in any sustain project, all the spare parts will be used in new OEM goods with installation recommendations, EPTT list, manufacturer’s instruction, qualification and Warranty certification.
We offer quotone equipment amp one particular circumstance, limitless support, specifically the following revenue provider commence from the orEPTTconfirmation, very last for the doing work life of the tools.