our products are selling nicely in the American, European, South American and Asian markets. Fantastic attention has been paid on environmental safety and strength saving. It has recognized secure cooperation with several nicely identified universities and institutes in china this kind of as, Zhejiang University, Jilin College, Complex committee of nationwide chain travel standard, Institute of national chain push, Zhejiang application engineering material institute, Huhan substance defense institute and it cooperated to located China Initial Automobile chain institute with National chain drive institute. Solution description of Ukraine used EPT roof action tile producing EPTry
Glazed tile roll forming EPT is 1 of our major items, it is much more and much more popular in latest several years due to the fact it truly is stunning in look amp EPT in style. We are a extremely professional producer of glazed tile roll forming EPT, with mature strategy and much more than 23 years’ experience, our EPTs have been sent to numerous nations all around the planet and received a excellent status for us.
This sort of EPT is very well-liked and common utilized in recent a long time
Similar EPT perhaps u like:
Operating method
The complete line incEPTs decoiler, forming EPT, computer managing system and run out tables. Our EPTs are outfitted with a personal computer managing program to preserve items precise.
Primary parameter
NO |
Variety |
Specification | |
one |
Raw materials | Variety | PPGI |
Feeding materials width | 914/1000/1200/1220/1250 mm | ||
Thickness | .three-.eight mm or as customer’s ask for | ||
2 |
Decoiler | Procedure | Guide |
WeigEPT apacity | 5 Tons | ||
three |
Principal body | Roller station | thirteen row |
Diameter of shaft | 75 mm | ||
Shaft material | forty five# with .05mm chrome | ||
Roller substance | forty five# with .05mm chrome | ||
Variety | EPT kind | ||
Body | 350mm C-beam | ||
Frame thickness | 16 mm | ||
EPT | Cr twelve | ||
Operation | EPT automatic | ||
Operating speed | Typical 3-5 m/min and servo motor 6-10m/min | ||
four |
EPT | Driving way | one.2 inch EPT |
Main motor | 5.five KW | ||
EPT station EPT | seven.5 KW | ||
Voltage | 380V/50HZ, three phase | ||
5 |
Control box | Electric box | PLC control technique, invEPTr |
PLC manufacturer | Delta created in EPTiwan | ||
Inverter manufacturer | Delta produced in EPTiwan | ||
Language | EPT and EPT |
Manual decoiler
It is passive kind could load coil by expend the blots resolve at coil inner diameter. It’s effortless to function and economical remedy.
XiHu (West Lake) Dis.hu (West Lake) Dis. unit
Undertake XiHu (West Lake) Dis.Hu (West Lake) Dis. bar and sliding block to handle the width and place of the metal sheet. The coil is XiHu (West Lake) Dis.Hu (West Lake) Dis.d in the proper place and handed to the roll forming technique. Can alter the XiHu (West Lake) Dis.Hu (West Lake) Dis. bar with loosing the fiXiHu (West Lake) Dis.ng bolts to feed sheet in rigEPT position. It truly is fastened structure to make certain can not go effortlessly.
Roll Forming Technique:
Roll forming program consist of EPT frame, EPT method, EPT motor and roll forming technique.
A. EPT frame adopts welding structure with shot blasting and painting treatment
B. All rollers substance undertake substantial high quality No. forty five metal, with challenging chrome coated on floor, all treatment by full CNC EPTs, to make sure the rollers with good rigidity and precision, and sort excellent roofing sheet as for every layout.
C. All rolling shafts are manufactured by higher high quality No. forty five metal with quench and mood treatment, so the shafts with great rigidity which could use for EPT tern with out deformation.
D. Rolling shafting supporting structure sort is steel wall and welded with the basement with each other to have rigidity.
E. Cycloidal pin EPT speed EPT motor EPTn, the back/EPT roller EPTn by EPT, component of higher/reduce rollers EPTn by EPT
F. Modify the screw bar manually to alter the length amongst higher/decrease rollers for difference thickness of sheet.
(Consideration: all rolling system has altered in our firm as a ideal situation, we never suggest to change the rollers at random, if required, should modify by a knowledgeable technician or following prepare by our engineer. Normally will cause the EPT can not kind a very good profile
Reducing gadget
A. Adopts post reducing, the slicing blade material is Cr12 with quenched remedy, soon after chopping, there is no substance squandered.
B. Adopts welded frame for very good rigidity.
C. The cutting motion is droved by the EPT from EPT station which assures the procession of the reducing and minimal noisy, EPT daily life.
EPT System
It is managed by EPT wheel oil pump. Following filling the EPT oil into the EPT oil tank, the pumps EPT the cutter EPT to commence the chopping work.
The system incEPTs a set of EPT tank, a set of EPT oil pump, two EPT pipes. And two sets of electromagnetism valves.
EPT of the oil pump: 3kw
EPT oil: forty#
PLC management system
It adopts EPT pc to control. The goal piece’s length is adjustable and digit of it can be altered. Computed mode has two modes: automated and guide one particular. The method is simple to work and use.
Processing precision: inside one.00mm
It contains liquid crystal EPT, programmer, transformer for the electronic EPTs and kits of each and every portion. Contact EPT
PLC is EPTiwan Panasonic
Transducer model is EPTiwan Delta
The seller need to offer EPT and EPT language EPT
Counter
One counter gauges length, pulses, and decides size.
Work methods
To examine EPT video clip or more specifics, speak to with me
We EPT promote to heaps of nations around the world
Our certification
Organization info
EPT team is a professional company designing and creating roll forming EPTs estabEPTd in June 1996. We have four factories working in BeiEPTg, TianEPT and ZheJiang province. Far more than four hundred employees offer support for u.
EPT mostly incEPT trapezoidal metal roof/wall panel EPT, C ampZ shape purline EPT, freeway guardrail EPT, sandwich panel manufacturing line, deck forming EPT, C U L ligEPT keel EPT, shutter slat door forming EPT, reducing EPT, downpipe EPT, gutter EPT, and many others.
How to visit us?
Our support
one. Free of charge specialized assist and free of charge equipment offer.
2. Engineer accessible to service EPTry overEPT.
3. A single year warranty is offered.
four. EPT lifestyle specialized direction for free of charge.
five. We alwaEPToffer specialized assistance, quick response, all your inquire will be replied in 24 hrs.
Question amp Answer
one. Q: How to pay a visit to our company:
A: Fly to BeiEPTg Airport: By quickly practice From BeiEPTg South station to HangEPT west station
(1hour), then we can select up you to factory(40min).
B: Fly to ZheJiang Airport: By fast teach From ZheJiang XiHu (West Lake) Dis.hu (West Lake) Dis.ao station to HangEPT west
station(four.five hours), then we can decide up you to factory(40min).
two. Q: What must I give if I want to personalized EPT?
A: U require supply profile drawing, substance, thickness, voltage and your EPT needs.
3. Q: What is the Guarantee?
A: Inside twelve mounts, all technicals are completely ready to provide you at any time.
four. Q: What can you do if the EPT broken?
A: Our EPT’s warranty period of time is twelve months, if the damaged components can not fix, we will send
new elements substitute the damaged parts cost-free, but you want pay out the categorical EPT if soon after guarantee time period. we can negotiate to resolve the problem, and we offer the complex assist for EPT lifestyle of products.
5. Q: If need technician to workshop to debug and instruct, how to do?
A: We despatched technician to your nation to correct the EPT. Purchaser should bear EPT incXiHu (West Lake) Dis.Hu (West Lake) Dis.: visa, spherical excursion ticket and ideal accommodation, also consumer ought to shell out the wage a hundred USD/working day.